[R] Narrowing values collected from .txt file

Morway, Eric emorway at usgs.gov
Thu Aug 29 01:45:55 CEST 2013


It looks as though the attachment to my last post didn't make the cut (or
at least it's not appearing on the Nabble forum), for one reason or
another.  I'm reattaching a smaller version so folks can run the code
(won't work without a text file to operate on).  So, while the attached
file is only a small sample of the larger file and will therefore run
quickly, I would still be helpful if someone knows a more efficient
approach to the code in the previous post.


On Wed, Aug 28, 2013 at 11:28 AM,

>
> A relatively concise, commented, working solution to the problem
> originally motivating this thread was found (below).  I suspect the
> approach I've taken has a major inefficiency through the use of the
> "scan" statement appearing inside the function "g".  The way the code
> works right now, it has to re-open and read the file 'length(matched)
> times' rather than sequentially reading through to the next pertinent
> section of the txt file.  Does anyone have a more efficient approach in
> mind so I don't have to wait 1/2 hour to get the results? (The only
> adjustment to the code that follows is to point "txt" to wherever the
> attached file is placed)
>
>
> # where is the file?
> txt<-"c:/temp/MCR_Budgets.txt"
>
> # Demarcation header
> hdr_str<-"Flow Budget for Zone  2"
>
> # string to identify lines with desired values
> srch_str<-"  RECHARGE ="
>
> # retrieves desired values
> g<-function(txt_con, hdr_str, srch_str, from, to, ...) {
>
>     L <- readLines(txt_con)
>
>     #matched contains the line #s w/ hdr_str
>     matched <- grep(hdr_str, L, value = FALSE, ...)
>
>     #initialize output list
>     fetched_list<-numeric()
>
>     #for each instance of hdr_str, loop
>     for(i in 1:(length(matched))){
>
>       #retrieve a section of text following each hdr_str
>       snippet<-scan(txt_con, what=character(), skip=matched[i]-1, n=42,
> sep='\n')
>
>       #get data within the short section of retrieved text
>       fetched <- grep(srch_str, snippet, value=TRUE)
>
>       #append output vector for plotting time series
>       fetched_list <- c(fetched_list, as.numeric(substring(fetched, from,
> to)))
>
>       #monitor
>       print(i)
>     }
>
>     #return desired values
>     as.numeric(fetched_list)
> }
>
> #The results of system.time reflect full 147 MB file,
> # only half of which is attached.
> system.time(
>   rech_z2<-g(txt,hdr_str,srch_str,37,51)
> )
> #   user  system elapsed
> #1740.48   36.08 1825.77
>
>
-------------- next part --------------
 ZONEBUDGET version 3.01                 
 Program to compute a flow budget for subregions of a model using
 budget data from MODFLOW, the USGS Modular Ground-Water Flow Model.
 
  The cell-by-cell budget file is:
 mcr.cbc                                                                         
  Single precision budget file
          6 layers       376 rows       546 columns
 
 mark_zone                                                                       
 
  The zone file is:
 mcr.zon                                                                         
 
 Zone Array for layer   1 will be read from the Zone File
 Zone Array for layer   1 will be read using format: (546I3)             
 -----------------------------------------------------------------------

       1  2  3  4  5  6  7  8  9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
      26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
      51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
      76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99100
     101102103104105106107108109110111112113114115116117118119120121122123124125
     126127128129130131132133134135136137138139140141142143144145146147148149150
     151152153154155156157158159160161162163164165166167168169170171172173174175
     176177178179180181182183184185186187188189190191192193194195196197198199200
     201202203204205206207208209210211212213214215216217218219220221222223224225
     226227228229230231232233234235236237238239240241242243244245246247248249250
     251252253254255256257258259260261262263264265266267268269270271272273274275
     276277278279280281282283284285286287288289290291292293294295296297298299300
     301302303304305306307308309310311312313314315316317318319320321322323324325
     326327328329330331332333334335336337338339340341342343344345346347348349350
     351352353354355356357358359360361362363364365366367368369370371372373374375
     376377378379380381382383384385386387388389390391392393394395396397398399400
     401402403404405406407408409410411412413414415416417418419420421422423424425
     426427428429430431432433434435436437438439440441442443444445446447448449450
     451452453454455456457458459460461462463464465466467468469470471472473474475
     476477478479480481482483484485486487488489490491492493494495496497498499500
     501502503504505506507508509510511512513514515516517518519520521522523524525
     526527528529530531532533534535536537538539540541542543544545546

 mark_zone                                                                       
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   2
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.37855E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.12898E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  16 to   1 =    0.0000    
                   Zone  31 to   1 =    0.0000    
                   Zone  40 to   1 =    0.0000    
                   Zone  91 to   1 =    0.0000    
 
                          Total IN =   0.12898E+06
 
             OUT:
             ----
                           STORAGE =   0.58275E-04
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   1 to  16 =    399.88    
                   Zone   1 to  31 =    85204.    
                   Zone   1 to  40 =    12404.    
                   Zone   1 to  91 =    30968.    
 
                         Total OUT =   0.12898E+06
 
                          IN - OUT =   0.14138E-03
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  2 at Time Step   1 of Stress Period   2
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18833E-05
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.27416E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  15 to   2 =    0.0000    
                   Zone  31 to   2 =    0.0000    
                   Zone  91 to   2 =    13134.    
 
                          Total IN =   0.28729E+06
 
             OUT:
             ----
                           STORAGE =   0.10823E-04
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   2 to  15 =    6812.7    
                   Zone   2 to  31 =   0.20820E+06
                   Zone   2 to  91 =    72274.    
 
                         Total OUT =   0.28729E+06
 
                          IN - OUT =   0.58504E-02
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  3 at Time Step   1 of Stress Period   2
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.84894E-04
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    81084.    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  31 to   3 =    0.0000    
                   Zone  91 to   3 =    1234.9    
 
                          Total IN =    82319.    
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   3 to  31 =    53937.    
                   Zone   3 to  91 =    28382.    
 
                         Total OUT =    82319.    
 
                          IN - OUT =   0.81732E-03
 
               Percent Discrepancy =                0.00
1

 mark_zone                                                                       
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   3
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15770E-04
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.12898E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  16 to   1 =    0.0000    
                   Zone  31 to   1 =    0.0000    
                   Zone  40 to   1 =    0.0000    
                   Zone  91 to   1 =    0.0000    
 
                          Total IN =   0.12898E+06
 
             OUT:
             ----
                           STORAGE =   0.38262E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   1 to  16 =    399.88    
                   Zone   1 to  31 =    85214.    
                   Zone   1 to  40 =    12405.    
                   Zone   1 to  91 =    30958.    
 
                         Total OUT =   0.12898E+06
 
                          IN - OUT =   0.88928E-03
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  2 at Time Step   1 of Stress Period   3
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.27416E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  15 to   2 =    0.0000    
                   Zone  31 to   2 =    0.0000    
                   Zone  91 to   2 =    13215.    
 
                          Total IN =   0.28737E+06
 
             OUT:
             ----
                           STORAGE =   0.27267E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   2 to  15 =    6813.6    
                   Zone   2 to  31 =   0.20827E+06
                   Zone   2 to  91 =    72291.    
 
                         Total OUT =   0.28737E+06
 
                          IN - OUT =   0.69125E-03
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  3 at Time Step   1 of Stress Period   3
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    81084.    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  31 to   3 =    0.0000    
                   Zone  91 to   3 =    1262.7    
 
                          Total IN =    82346.    
 
             OUT:
             ----
                           STORAGE =   0.18113E-03
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   3 to  31 =    53843.    
                   Zone   3 to  91 =    28503.    
 
                         Total OUT =    82346.    
 
                          IN - OUT =  -0.14018E-02
 
               Percent Discrepancy =                0.00
1

 mark_zone                                                                       
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   4
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27619E-03
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.12898E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  16 to   1 =    0.0000    
                   Zone  31 to   1 =    0.0000    
                   Zone  40 to   1 =    0.0000    
                   Zone  91 to   1 =    0.0000    
 
                          Total IN =   0.12898E+06
 
             OUT:
             ----
                           STORAGE =   0.86048E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   1 to  16 =    399.88    
                   Zone   1 to  31 =    85222.    
                   Zone   1 to  40 =    12415.    
                   Zone   1 to  91 =    30939.    
 
                         Total OUT =   0.12898E+06
 
                          IN - OUT =  -0.14927E-02
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  2 at Time Step   1 of Stress Period   4
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.27416E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  15 to   2 =    0.0000    
                   Zone  31 to   2 =    0.0000    
                   Zone  91 to   2 =    13523.    
 
                          Total IN =   0.28768E+06
 
             OUT:
             ----
                           STORAGE =   0.10926E-01
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   2 to  15 =    6816.8    
                   Zone   2 to  31 =   0.20851E+06
                   Zone   2 to  91 =    72351.    
 
                         Total OUT =   0.28768E+06
 
                          IN - OUT =   0.30442E-03
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  3 at Time Step   1 of Stress Period   4
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    81084.    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  31 to   3 =    0.0000    
                   Zone  91 to   3 =    1529.0    
 
                          Total IN =    82613.    
 
             OUT:
             ----
                           STORAGE =   0.19885E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   3 to  31 =    52801.    
                   Zone   3 to  91 =    29812.    
 
                         Total OUT =    82613.    
 
                          IN - OUT =   0.17957E-02
 
               Percent Discrepancy =                0.00

 mark_zone                                                                       
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   5
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.36379E-03
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.12898E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  16 to   1 =    0.0000    
                   Zone  31 to   1 =    0.0000    
                   Zone  40 to   1 =    0.0000    
                   Zone  91 to   1 =    0.0000    
 
                          Total IN =   0.12898E+06
 
             OUT:
             ----
                           STORAGE =   0.14784E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   1 to  16 =    399.88    
                   Zone   1 to  31 =    85216.    
                   Zone   1 to  40 =    12424.    
                   Zone   1 to  91 =    30936.    
 
                         Total OUT =   0.12898E+06
 
                          IN - OUT =  -0.18928E-02
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  2 at Time Step   1 of Stress Period   5
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.27416E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  15 to   2 =    0.0000    
                   Zone  31 to   2 =    0.0000    
                   Zone  91 to   2 =    14013.    
 
                          Total IN =   0.28817E+06
 
             OUT:
             ----
                           STORAGE =   0.19315E-01
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   2 to  15 =    6821.6    
                   Zone   2 to  31 =   0.20891E+06
                   Zone   2 to  91 =    72438.    
 
                         Total OUT =   0.28817E+06
 
                          IN - OUT =   0.26581E-02
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  3 at Time Step   1 of Stress Period   5
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    81084.    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  31 to   3 =    0.0000    
                   Zone  91 to   3 =    2041.7    
 
                          Total IN =    83125.    
 
             OUT:
             ----
                           STORAGE =   0.41109E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   3 to  31 =    50673.    
                   Zone   3 to  91 =    32452.    
 
                         Total OUT =    83125.    
 
                          IN - OUT =   0.64988E-03
 
               Percent Discrepancy =                0.00

 mark_zone                                                                       
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   6
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20107E-03
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.12898E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  16 to   1 =    0.0000    
                   Zone  31 to   1 =    0.0000    
                   Zone  40 to   1 =    0.0000    
                   Zone  91 to   1 =    0.0000    
 
                          Total IN =   0.12898E+06
 
             OUT:
             ----
                           STORAGE =   0.12563E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   1 to  16 =    399.89    
                   Zone   1 to  31 =    85214.    
                   Zone   1 to  40 =    12429.    
                   Zone   1 to  91 =    30934.    
 
                         Total OUT =   0.12898E+06
 
                          IN - OUT =  -0.82634E-03
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  2 at Time Step   1 of Stress Period   6
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.27416E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  15 to   2 =    0.0000    
                   Zone  31 to   2 =    0.0000    
                   Zone  91 to   2 =    14152.    
 
                          Total IN =   0.28831E+06
 
             OUT:
             ----
                           STORAGE =   0.10904E-01
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   2 to  15 =    6821.5    
                   Zone   2 to  31 =   0.20905E+06
                   Zone   2 to  91 =    72438.    
 
                         Total OUT =   0.28831E+06
 
                          IN - OUT =   0.52095E-02
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  3 at Time Step   1 of Stress Period   6
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.26737E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    81084.    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  31 to   3 =    0.0000    
                   Zone  91 to   3 =    1750.3    
 
                          Total IN =    82834.    
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   3 to  31 =    51290.    
                   Zone   3 to  91 =    31544.    
 
                         Total OUT =    82834.    
 
                          IN - OUT =  -0.37810E-03
 
               Percent Discrepancy =                0.00
1
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   7
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10149E-03
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.12898E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  16 to   1 =    0.0000    
                   Zone  31 to   1 =    0.0000    
                   Zone  40 to   1 =    0.0000    
                   Zone  91 to   1 =    0.0000    
 
                          Total IN =   0.12898E+06
 
             OUT:
             ----
                           STORAGE =   0.15845E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   1 to  16 =    399.88    
                   Zone   1 to  31 =    85211.    
                   Zone   1 to  40 =    12432.    
                   Zone   1 to  91 =    30933.    
 
                         Total OUT =   0.12898E+06
 
                          IN - OUT =  -0.32836E-02
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  2 at Time Step   1 of Stress Period   7
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.27416E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  15 to   2 =    0.0000    
                   Zone  31 to   2 =    0.0000    
                   Zone  91 to   2 =    14200.    
 
                          Total IN =   0.28836E+06
 
             OUT:
             ----
                           STORAGE =   0.79129E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   2 to  15 =    6820.1    
                   Zone   2 to  31 =   0.20911E+06
                   Zone   2 to  91 =    72428.    
 
                         Total OUT =   0.28836E+06
 
                          IN - OUT =   0.18527E-02
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  3 at Time Step   1 of Stress Period   7
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13050E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    81084.    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  31 to   3 =    0.0000    
                   Zone  91 to   3 =    1567.6    
 
                          Total IN =    82651.    
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   3 to  31 =    52133.    
                   Zone   3 to  91 =    30518.    
 
                         Total OUT =    82651.    
 
                          IN - OUT =   0.20639E-03
 
               Percent Discrepancy =                0.00
1

 mark_zone                                                                       
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   8
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.44065E-04
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.12898E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  16 to   1 =    0.0000    
                   Zone  31 to   1 =    0.0000    
                   Zone  40 to   1 =    0.0000    
                   Zone  91 to   1 =    0.0000    
 
                          Total IN =   0.12898E+06
 
             OUT:
             ----
                           STORAGE =   0.14495E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   1 to  16 =    399.89    
                   Zone   1 to  31 =    85210.    
                   Zone   1 to  40 =    12433.    
                   Zone   1 to  91 =    30933.    
 
                         Total OUT =   0.12898E+06
 
                          IN - OUT =   0.16619E-03
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  2 at Time Step   1 of Stress Period   8
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.27416E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  15 to   2 =    0.0000    
                   Zone  31 to   2 =    0.0000    
                   Zone  91 to   2 =    14834.    
 
                          Total IN =   0.28899E+06
 
             OUT:
             ----
                           STORAGE =   0.27229E-01
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   2 to  15 =    6825.3    
                   Zone   2 to  31 =   0.20962E+06
                   Zone   2 to  91 =    72547.    
 
                         Total OUT =   0.28899E+06
 
                          IN - OUT =   0.15796E-02
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  3 at Time Step   1 of Stress Period   8
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    81084.    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  31 to   3 =    0.0000    
                   Zone  91 to   3 =    2391.3    
 
                          Total IN =    83475.    
 
             OUT:
             ----
                           STORAGE =   0.61833E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   3 to  31 =    48975.    
                   Zone   3 to  91 =    34500.    
 
                         Total OUT =    83475.    
 
                          IN - OUT =   0.18733E-02
 
               Percent Discrepancy =                0.00
1

mark_zone                                                                       
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   9
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.12898E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  16 to   1 =    0.0000    
                   Zone  31 to   1 =    0.0000    
                   Zone  40 to   1 =    0.0000    
                   Zone  91 to   1 =    0.0000    
 
                          Total IN =   0.12898E+06
 
             OUT:
             ----
                           STORAGE =   0.10901E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   1 to  16 =    399.89    
                   Zone   1 to  31 =    85212.    
                   Zone   1 to  40 =    12432.    
                   Zone   1 to  91 =    30932.    
 
                         Total OUT =   0.12898E+06
 
                          IN - OUT =  -0.10139E-02
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  2 at Time Step   1 of Stress Period   9
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.27416E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  15 to   2 =    0.0000    
                   Zone  31 to   2 =    0.0000    
                   Zone  91 to   2 =    14887.    
 
                          Total IN =   0.28904E+06
 
             OUT:
             ----
                           STORAGE =   0.12237E-01
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   2 to  15 =    6823.0    
                   Zone   2 to  31 =   0.20970E+06
                   Zone   2 to  91 =    72518.    
 
                         Total OUT =   0.28904E+06
 
                          IN - OUT =  -0.14947E-02
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  3 at Time Step   1 of Stress Period   9
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.39472E-02
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    81084.    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  31 to   3 =    0.0000    
                   Zone  91 to   3 =    1896.9    
 
                          Total IN =    82981.    
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   3 to  31 =    50408.    
                   Zone   3 to  91 =    32572.    
 
                         Total OUT =    82981.    
 
                          IN - OUT =  -0.10577E-02
 
               Percent Discrepancy =                0.00
1

 mark_zone                                                                       
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  10
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.95680E-04
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.12898E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  16 to   1 =    0.0000    
                   Zone  31 to   1 =    0.0000    
                   Zone  40 to   1 =    0.0000    
                   Zone  91 to   1 =    0.0000    
 
                          Total IN =   0.12898E+06
 
             OUT:
             ----
                           STORAGE =   0.82025E-04
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   1 to  16 =    399.89    
                   Zone   1 to  31 =    85212.    
                   Zone   1 to  40 =    12431.    
                   Zone   1 to  91 =    30933.    
 
                         Total OUT =   0.12898E+06
 
                          IN - OUT =   0.86815E-03
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  2 at Time Step   1 of Stress Period  10
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =   0.27416E+06
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  15 to   2 =    0.0000    
                   Zone  31 to   2 =    0.0000    
                   Zone  91 to   2 =    14978.    
 
                          Total IN =   0.28913E+06
 
             OUT:
             ----
                           STORAGE =   0.12544E-01
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   2 to  15 =    6821.1    
                   Zone   2 to  31 =   0.20980E+06
                   Zone   2 to  91 =    72515.    
 
                         Total OUT =   0.28913E+06
 
                          IN - OUT =  -0.33737E-03
 
               Percent Discrepancy =                0.00
1
 mark_zone                                                                       
 
     Flow Budget for Zone  3 at Time Step   1 of Stress Period  10
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    81084.    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone  31 to   3 =    0.0000    
                   Zone  91 to   3 =    1947.9    
 
                          Total IN =    83032.    
 
             OUT:
             ----
                           STORAGE =   0.55572E-03
                     CONSTANT HEAD =    0.0000    
                          RECHARGE =    0.0000    
                    STREAM LEAKAGE =    0.0000    
                     LAKE  SEEPAGE =    0.0000    
                            UZF ET =    0.0000    
                             GW ET =    0.0000    
                      UZF INFILTR. =    0.0000    
                  SFR-DIV. INFLTR. =    0.0000    
                      UZF RECHARGE =    0.0000    
                   SURFACE LEAKAGE =    0.0000    
                   Zone   3 to  31 =    50466.    
                   Zone   3 to  91 =    32566.    
 
                         Total OUT =    83032.    
 
                          IN - OUT =   0.79892E-02
 
               Percent Discrepancy =                0.00
1


More information about the R-help mailing list