Dear list members, I would like to plot a time series, with grayshaded background in time phases were the value of the timeseries exceeds the mean value. For example, if the temperature from 1995-1998 exeeds the mean value between 1980 and 2005, the background in the plot from 1995-1998 shall be shaded. Can anybody help me? Thanks Thomas H.