[Rd] cut.Date and cut.POSIXt problem
Marc Schwartz
marc_schwartz at comcast.net
Wed Mar 26 16:03:29 CET 2008
Martin Maechler wrote:
>>>>>> "RDP" == Roger D Peng <rpeng at jhsph.edu>
>>>>>> on Wed, 26 Mar 2008 09:18:19 -0400 writes:
>
> RDP> I have applied these patches to R-devel and in my limited testing they appear to
> RDP> work as desired. I have to say that I never ran into the problem these patches
> RDP> were meant to solve so I may not be the best person to do the testing.
>
> that must have been an old version of R-devel, since Marc's
> patches had made it "officially" into R-devel on Monday,
> and subsequently also into R-2.7.0 alpha.
>
> With thanks to Marc, Brian, Roger and other contributors,
> Martin
Thanks Martin and thanks to Roger, Gabor and Prof. Ripley for taking the
time to review and commit the patches.
Also note that patches were included to add "quarter[s]" as a defined
break interval to cut.Date() and cut.POSIXt() and that these patches
were also made to hist.Date() and hist.POSIXt() so that those functions
support the new break intervals as well.
The help files for these have also been updated.
Lastly, a patch was added to tests/reg-tests-1.R for the original issue
raised by Gabor.
Thanks again to everyone.
Regards,
Marc
More information about the R-devel
mailing list