[Bioc-devel] Package submission deadline Bioconductor 3.18

Roger Bivand Roger@B|v@nd @end|ng |rom nhh@no
Wed Aug 23 13:52:20 CEST 2023


I have posted here before to warn that three CRAN spatial infrastructure packages will be retired/archived in October 2023 [1]. It would be very helpful if Bioconductor 3.18 packages made no use at all of rgdal. rgeos or maptools, and that those using sp added sf as a suggested package if operations on coordinate reference systems are used. Is it possible to add blocks on the use of retiring packages to 3.18 checks?

Roger

[1] https://stat.ethz.ch/pipermail/bioc-devel/2023-June/019727.html

--
Roger Bivand
Emeritus Professor
Norwegian School of Economics
Postboks 3490 Ytre Sandviken, 5045 Bergen, Norway
Roger.Bivand using nhh.no


More information about the Bioc-devel mailing list